December 2, 2004: Erecting the floor beams for the 14th edge girders
Slowly slowly lifting the floor girder from the barge
And slowly slowly dropping the floor girder into place. Note the traffic
cop under the right of the beam directing the crane operator
>
>
This work is licensed under a Creative Commons License.
Attribution: C. Frank Starmer from http://ravenelbridge.net
_
|